| LAPORAN EIA SEDANG PROSES |
Jenis Laporan : PEIA
Jumlah : 19
Nama projek
|
Nama Penggerak Projek
|
Nama Syarikat Jururunding EIA
|
Negeri |
Ringkasan Eksekutif |
Proposed Kuantan Resin Plant (KRP) Project, Plot 121, Phase II Area, Gebeng Industrial Estate, Mukim Sg. Karang, Daerah Kuantan, Pahang Darul Makmur |
Flexsys Chemical (M) Sdn.Bhd |
ERM Asia Pacific (M) Sdn. Bhd. |
Pahang |
|
Proposed Granitic Quarry Operation On De-Gazetted 71.98 Acres (29.13HA) Forest Reserve Known As Hutan Simpan Kekal Som, Mukim Kuala Tembeling, District Of Jerantut, Pahang Darul Makmur |
Ahmad Al Kamal & Rosidi Sdn. Bhd. |
Capai Cerah Sdn. Bhd. |
Pahang |
|
PROPOSED SCHEDULED WASTES STORAGE AND PROCESSING FACILITY AT LOT 728, BLOCK 8, DEMAK LAUT INDUSTRIAL ESTATE PHASE 3, JALAN BAKO, MUARA TEBAS LAND DISTRICT, KUCHING DIVISON, SARAWAK |
Shan Poornam Metals Sdn. Bhd. |
MEX Environmental Sdn. Bhd. |
Sarawak |
|
CADANGAN PEMBANGUNAN BERCAMPUR DI MUARA UTARA DAN MUARA SELATAN BANDAR KUALA TERENGGANU, DAERAH KUALA TERENGGANU, TERENGGANU. |
East Cost Economic Region Development (ECERDC) |
ERE Consulting Group Sdn. Bhd. |
Terengganu |
|
Proposed Additional of Scheduled Waste Code for Existing Scheduled Wastes Recovery Facility at Plo 616,Jln Miel 1,Off Jln Keluli 9,Kawasan Perindustrian Miel IV, 81700 Pasir Gudang,Johor |
Estalco Sdn Bhd |
Green Earth Consultancy & Servis |
Johor |
|
PROPOSED MIXED DEVELOPMENT ON LOT 1659, MUKIM HOSBA, DAERAH KUBANG PASU, KEDAH DARUL AMAN. |
PERBADANAN KEMAJUAN NEGERI KEDAH |
GLISTEN ENVIRONMENTAL CONSULTANTS SDN. BHD. |
Kedah |
|
Cadangan Skim Perumahan 39 blok rumah pangsa 5 tingkat (390 unit) diatas lot 1204(lot asal sebahagian lot 31)lot 439,478,479,553,908 dan lot 942 Mukim 17 Jalan sungai satu, bandar batu feringgi,DTL |
Uptrend Housing Development Sdn.Bhd |
Green Acres Studio Sdn.Bhd |
Pulau Pinang |
|
BUKIT MOR QUARRY
AT PTD 4084 AND PTD 3973
PARIT JAWA,MUAR
JOHOR DARUL TAKZIM |
APEX GRANITE SDN BHD |
CHEMSAIN KONSULTANT SDN BHD |
Johor |
|
'BAGUNAN PERANGINAN WATER CHALET DAN SERVICE SUITE' DI ATAS LOT TANAH KERAJAAN SELUAS 43.1 EKAR, PEKAN SUNGAI MENYALA, PORT DICKSON, N.SEMBILAN |
KL METRO SDN BHD |
FANLI MARINE AND CONSULTANCY SDN BHD |
Negeri Sembilan |
|
Proposed Sewage Treatment Plant(Phase 1) at Beaufort, Sabah |
Jabatan Kerja Raya Sabah |
Kiwiheng Wood & Environmental Consultantants Sdn Bhd |
Sabah |
|
HOLISTIC EIA FOR NEW PIPELINES INSTALLATION AND REPLACEMENT PROJECT IN TANDEM WITH SKO PIPELINES REJUVENATION PROGRAM WITHIN SARAWAK WATER BETWEEN 2012-2014 |
PETRONAS CARIGALI |
SCIENTIGE SDN.BHD |
Sarawak |
|
PROPOSED SCHEDULED WASTES RECOVERY PLANT AT DEMAK LAUT INDUSTRIAL AREA, KUCHING, SARAWAK |
Victory Recovery Resources (EM) Sdn. Bhd. |
Chemsain Konsultant Sdn. Bhd. |
Sarawak |
|
Supplementary EIA For Proposed Deepening Of Seabed Level At Malaysia Marine And Heavy engineering Facility (Quay 6) And Offshore Disposal Of Spoil Off Pungai, Johor |
Malaysia Marine And Heavy Engineering Sdn Bhd |
LI Environmental Consultans Sdn Bhd |
Johor |
|
West Desaru Field Development (EPS) Project, Block PM304, Offshore Terengganu |
Petrofac (Malaysia) |
ENVIRONMENTAL RESOURCES MANAGEMENT (M) SDN. BHD. |
Terengganu |
|
The Proposed Detailed Design And Supervision Works For The Development Of Herbal And Biotechnology Product Clusters In Chegar Perah, Lipis, Pahang Darul Makmur |
East Coast Economic Region Development Council |
Asian Environmental Solutions Sdn. Bhd. |
Pahang |
|
PEIA bagi cadangan projek penanaman pokok getah klon balak (400.0 ha) di Hutan Simpan Kekal Serasa (komp 9, 14, 15, 16 & 17), Mukim Kuala Stong, Daerah Dabong, Kuala Krai, Kelantan Darulnaim. Oleh Milan Timber Enterprise |
Milan Timber Enterprise Sdn Bhd |
I.Z Environmind Sdn Bhd |
Kelantan |
|
PEIA) bagi cadangan projek penanaman pokok getah klon balak (400.0 ha) di Hutan Simpan Kekal Serasa (komp 9, 14, 15, 16 & 17), Mukim Kuala Stong, Daerah Dabong, Kuala Krai, Kelantan Darulnaim. Oleh Milan Timber Enterprise Sdn Bhd |
MILAN TIMBER ENTERPRISE SDN BHD |
I.Z Environmind Sdn Bhd |
Kelantan |
|
Cadangan Membina 1 Blok Pangsapuri Di Atas Lot 218 Seluas 2.137 Ekar, Brinchang, Mukim Tanah Rata, Daerah Cameron Highlands, Pahang Darul Makmur |
Kappa Management Sdn. Bhd. |
VT Soil Tech Sdn. Bhd. |
Pahang |
|
PROPOSED RECOVERY PLANT (OFF-SITE) AT ASIAN SUPPLY BASE OLEH CAHAJASA SDN BHD |
CAHAJASA SDN BHD |
ENVSOLVE SDN BHD |
W.P.Labuan |